Ç. Meral Et Al. , "Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches," BUILDINGS (BASEL) , vol.14, no.8, pp.1-18, 2024
Meral, Ç. Et Al. 2024. Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches. BUILDINGS (BASEL) , vol.14, no.8 , 1-18.
Meral, Ç., Temel, B. A., & Başağa, H. B., (2024). Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches. BUILDINGS (BASEL) , vol.14, no.8, 1-18.
Meral, Çetin, BAYRAM ALİ TEMEL, And HASAN BASRİ BAŞAĞA. "Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches," BUILDINGS (BASEL) , vol.14, no.8, 1-18, 2024
Meral, Çetin Et Al. "Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches." BUILDINGS (BASEL) , vol.14, no.8, pp.1-18, 2024
Meral, Ç. Temel, B. A. And Başağa, H. B. (2024) . "Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches." BUILDINGS (BASEL) , vol.14, no.8, pp.1-18.
@article{article, author={Çetin Meral Et Al. }, title={Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches}, journal={BUILDINGS (BASEL)}, year=2024, pages={1-18} }