B. Gürsoy Yılmaz Et Al. , "Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems," International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024) , Balıkesir, Turkey, pp.245-253, 2024
Gürsoy Yılmaz, B. Et Al. 2024. Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems. International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024) , (Balıkesir, Turkey), 245-253.
Gürsoy Yılmaz, B., Çevikcan, E., & Yılmaz, Ö. F., (2024). Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems . International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024) (pp.245-253). Balıkesir, Turkey
Gürsoy Yılmaz, BEREN, Emre Çevikcan, And ÖMER FARUK YILMAZ. "Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems," International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024), Balıkesir, Turkey, 2024
Gürsoy Yılmaz, BEREN G. Et Al. "Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems." International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024) , Balıkesir, Turkey, pp.245-253, 2024
Gürsoy Yılmaz, B. Çevikcan, E. And Yılmaz, Ö. F. (2024) . "Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems." International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024) , Balıkesir, Turkey, pp.245-253.
@conferencepaper{conferencepaper, author={BEREN GÜRSOY YILMAZ Et Al. }, title={Optimizing Workforce and Sub-Lot Scheduling in Seru Production Systems}, congress name={International Conference on Engineering, Natural Sciences, and Technological Developments (ICENSTED 2024)}, city={Balıkesir}, country={Turkey}, year={2024}, pages={245-253} }