Trabzon limanı ve Değirmendere bölgesinde veri toplama ve modelleme


Köse E., Seyhan K. (Yürütücü)

1. Çerçeve Programı Projesi, 2014 - 2015

  • Proje Türü: 1. Çerçeve Programı Projesi
  • Başlama Tarihi: Aralık 2014
  • Bitiş Tarihi: Aralık 2015

Proje Özeti


1.   General information about project


Black Seacross-borderproject, ICMA, analysis the effects of sediment brought by Değirmendere on the port of Trabzonand its surroundings. Different scenarios and their effects will be investigated by using mathematical hydrodynamic model. Then, possible measures to be takenwill reveal. In order to establish correct model stated themonthlyoceanographicmeasurement will be done at Değirmendereandharbors.Thissamplingwill be carried out in astated time duration and the mathematical hydrodynamic models (mathematical models of spread of the pollutants, myocean result downscaling and sediment transport) and management scenarios for the Trabzon Port and Değirmendere area will be developed.


1.1.       Contract Objectives


Alloceanographicparameters given below will be measured with suppliedequipment (the equipment supplied by the Contracting Authority) for stated time duration, and raw datawill be reportedin MS EXCEL. Then, a mathematical model will be developed to investigate the hydrodynamic flow around Trabzon port and surroundings.The management strategieswill reveal to minimize sediment accumulations in and around Trabzon Harbor.