BRODOGRADNJA, cilt.66, sa.1, ss.39-53, 2015 (SCI-Expanded)
Shipbuilding industry includes many different industry branches in itself so various kind of work accidents occur. These work accidents often cause serious injuries and also deaths. It is a crucial thing to prevent or minimize these accidents. In order to reduce work accidents in shipyards, the most hazardous activities are needed to be determined and then, shipyard management must work on it in order to remove these hazard sources. In this study, pin jig work unit, where the curved parts are mounted on adjustable pin jigs, was considered. At first, the work activities and operations of pin jig work station were identified and they were classified as main and sub risk criterions. Then, pair comparison scales were built and these risk criterions were evaluated by experts who have been working for a shipyard located in Turkey. As a result of the evaluations of the experts, the risk weights of the activities carried out at pin jig work unit were defined by using fuzzy AHP method. Therefore, it is aimed for the shipyard management to take some precautions at pinjig work unit on the risky operations before failures happen.