JOURNAL OF ETA MARITIME SCIENCE, vol.6, no.2, pp.93-102, 2018 (ESCI)
In this study, the production process of a Black Sea type fishing boat was examined in detail, and a model was created in the SIMIO simulation base. With this model, the production period of Black Sea type fishing boat was determined. Subsequently, by changing working hours in the manufacture of boats, the production duration of the boat was determined and the effects of working hours on the boat production period were investigated. Consequently, it was observed that not every increase in working time affected the production of boats, and the effects of regular increases in working hours on the production period of Black Sea type of boats were quantified.