SUMARSKI LIST, cilt.141, ss.375-386, 2017 (SCI-Expanded)
Harvest scheduling has emerged as time consuming and difficult activity especially when includes operation plans in the absence of decision support systems. In this study, the level of allowable cut and timber extraction system for every stand was determined for spruce management unit of a mountainous Ikisu planning unit in Turkey using linear programming model designed for 50 year planning horizon. First, different considerations such as maximization of timber cut with non -exceeding more than a certain distance between the centroids of compartments and the nearest forest roads were taken into account in determining the level of harvest. Approximately 68,728 m(3) annual allowable cut was determined for the.first period of planning horizon. Then, six different timber extraction systems were incorporated during the designation of timber extraction method for the first 10 year period of the planning horizon. These are man power, animal power, skidder, small size cable crane, medium size cable crane and sledge yarder. Different factors such as transport direction, slope, distance to forest road, efficiency or cost were also taken into account in decision making. Various planning strategies were developed, including maximization of profit, minimization of timber loss, under time restrictions and solved with UNDO software. One of the strategies was selected based on the availability of the machineries, legal arrangements, staff and economic conditions of the forest enterprise. According to the selected strategy (STR2), with the maximal total profit from timber production including time constraints less than 2,000 hours for cable cranes and sledge yarders, 6,365,205 would be earned, 19,055 hours would be spent, and 1,697.8 m(3) timber would be lost, while 91.77 damage would occur. As a result this determination could bring us benefits especially in environmental awareness, time, labor and money when compared to the classical approaches.